Data Gateway Optimizations
  • 23 May 2024
  • 1 Minute to read
  • Contributors
  • Dark
    Light

Data Gateway Optimizations

  • Dark
    Light

Article summary

Expected Savings

$12000 p/a

Implementation Date

May 2023

Review Date

Jan 2023

Actual Savings

$12000 p/a

Using Turbo360 scheduler we have modified the state of the non production data gateway virtual machines to suit the usage of the test environments.

We are shutting down and turning on a schedule that can be easily maintained.

You can get a decent saving per month on each VM by doing this

We were able to obtain a $1000 per month saving from this.


Was this article helpful?